Haewoori offshore wind awards FEED contract in Korea

Haewoori Offshore Wind 2 (500MW) and 3 (500MW), Copenhagen Infrastructure Partner’s floating offshore wind projects off the coast of Ulsan, Korea have awarded a front-end engineering and design (FEED) contract to Aker Solutions and Principle Power for the floating foundations.

As part of the scope, Aker Solutions will coordinate the design and delivery of the floating foundation structures required for the Haewoori Offshore Wind project and perform the front-End Engineering design of the inter-array cable, marshaling port, wind turbine integration, and transport and installation.

Principle Power will work under subcontract to perform the design of the floating platforms and mooring system based on its proven and bankable WindFloat® technology. Aker Solutions will also carry out execution planning, and work with Haewoori Offshore Wind to engage with the Korean supply chain to maximise local engagement in the projects.

Work will start immediately on FEED and is due to be completed by November 2024.

Previous articleEni to develop key natural gas production
Next articleKorean shipbuilder joins maritime SMR project