Zhejiang Yisheng starts production in Ningbo

Zhejiang Yisheng New Material, one of China’s Purified Terephthalic Acid (PTA) producers, has restarted production at its No. 1 PTA line in Ningbo, China, following planned preventative maintenance. On January 3, repair work on this line, which can produce 3.3 million tonnes of PTA annually, began. It was finished on January 19.

Zhejiang Yisheng New Material runs PTA facilities in China. The business is a partnership between Rongsheng Petrochemical and Zhejiang Hengyi Petrochemical.

From late January, the PTA plant’s running rate quickly increased. The pre-overhauled factories have all been reopened one after another, except for the unexpected stoppage of Zhongtai’s 1.2 million tonne unit. The new plants are also operating efficiently. The 2.5 million ton/year PTA units from Dongying Weilian and Jiatong Energy operated at 80% and 90%, respectively. According to upstream and downstream operating rates, the average daily inventory buildup in late January is roughly 30,000 tonnes.

In general, PTA seasonal inventory accumulation in January-February is expected to be above 1 million tonnes due to the current high operating rate of PTA plants, which will have downward pressure on the PTA margin and basis. Considering the high cost, expected demand recovery, and reduced raw material stock, polyester producers will increase the procurement after the holiday, and the PTA inventory will gradually shift downward in the later period.

Previous articleSakhalin Energy continues hydrocarbon production
Next articleVale Indonesia to collaborate with Tisco